(1 / 1)
Date: June 26, 1991 15:28
From: BERT::MEYETTE
To: RAY,SMITHSON,MONCRIEF,MARGOLIN,TAKAICHI
CC: MEYETTE
Due to a multitude of problems and unresolved design changes, I am delaying the UL tests on BMX Heat until Thursday, July 11. In order to avoid having to repeat this testing at later date, I need to have the following by that date. 1. NUMFA Board - A working REV 2 prototype board with a sample of the Magnetek and Signal transformers. 2. Motor Filter - A working prototype filter assembly, including the heatsink or metal chassis. 3. Platform Covers - All platform covers, installed on the prototype game. 4. Plastic Materials - Specification of the plastic materials to be used for the platform covers, nylon insulators, and any other molded platic parts on this game. 5. Software - A working program that will interface with the NUMFA board in game play, and include self-test routines to exercise the motor and fan. 6. Harnesses - All changes in the harnesses layout to be incorporated in the UL/FCC game, including the revised motor cable and harnesses to the NUMFA board. 7. Power Supply - Production prototype power supply assembly, with the covers for the fuse block and terminal block installed.
Jun 26, 1991